CANADIAN RAILWAY OFFICE OF ARBITRATION & DISPUTE RESOLUTION
BUREAU D’ARBITRAGE ET MÉDIATION DES CHEMINS DE FER DU CANADA

MONTRÉAL, QUÉBEC

HORAIRE POUR LE DÉCEMBRE 2009
SCHEDULE FOR DECEMBER 2009

L’arbitre M.G. Picher que préside / Arbitrator M. G. Picher presiding

 

Updated 23 December 2009

return

Mis à jour le 23 décembre 2009

retour

[xxx]

 

TUESDAY, 08 DECEMBER 2009 / MARDI, LE 8 DÉCEMBRE 2009

 

BAMCFC 3831

Litige ex parte entre VIA Rail et TCA concernant le modification de l’assignation de M. Michel Chiasson suite à une assignation temporaire. Le litige sera limité aux objections préliminaires de la Corporation.

BAMCFC 3832

Litige ex parte entre VIA Rail et TCA concernant le modification de l’assignation de M. B. Woods suite à une assignation temporaire. Le litige sera limité aux objections préliminaires de la Corporation.

BAMCFC 3833

Litige ex parte entre VIA Rail et TCA concernant le reclassement du poste de vérification des stocks (entrepôt). Le litige sera limité aux objections préliminaires de la Corporation.

CROA&DR 3834

Dispute between CNR and TCRC concerning the discipline assessed Locomotive Engineer J. Chevalier for his alleged unacceptable conduct which resulted in his discharge for the accumulation of demerits. [COUNSEL]

CROA&DR 3835

Dispute between CNR and TCRC concerning discharge of Locomotive Engineer B. Gibson for his alleged violation of CROR rule 439. [COUNSEL]

WEDNESDAY,  09 DECEMBER 2009 / MERCREDI, LE 9 DÉCEMBRE 2009

BAMCFC 3836

Litige entre CANPAR et MÉTALLOS (1976) concernant le congédiement d’un employé.

CROA&DR 3837

Dispute between CPR and TCRC/MWED concerning claim on behalf of S. Bayley that he was improperly disqualified from his bid position.

IEHP

Various disputes between CPR and TCRC/MWED to be dealt with using the IEHP process.

THURSDAY,  10 DECEMBER 2009 / JEUDI, LE  10 DÉCEMBRE  2009

CROA&DR 3838

Ex parte dispute between CNR and TCRC concerning the suspension assessed Locomotive Engineer B. Chychul. [COUNSEL]

CROA&DR 3839

Ex parte dispute between CNR and TCRC concerning the 15 demerits assessed Locomotive Engineer L. Grzesiak following his alleged failure to comply with proper radio procedures, March 19, 2009. [COUNSEL]

CROA&DR 3840

Ex parte dispute between CNR and TCRC concerning the 40 demerits assessed Locomotive Engineer L. Grzesiak following his tour of duty July 3, 2009 which resulted in his discharge for the accumulation of demerits. [COUNSEL]

CROA&DR 3841

Ex parte dispute between CNR and TCRC concerning the discipline assessed Locomotive Engineer S. VanDerMark for his alleged violation of CROR rules and the Company’s drug & alcohol policy. [COUNSEL]

CROA&DR 3842

Ex parte dispute between CNR and TCRC concerning the discipline assessed Conductor J. Turnbull for his alleged violation of CROR 104 which resulted in his discharge for the accumulation of demerits. [COUNSEL]

CROA&DR 3824

CROA&DR 3824: Ex parte dispute between CNR and TCRC concerning the discipline assessed K. Gelowitz which resulted in his discharge for the accumulation of demerits. Hearing subject to Arbitrator’s award concerning the Company’s preliminary objection. [COUNSEL]

SUPP 3753

Supplementary award in CROA&DR 3753.

13 CASES SCHEDULE

9 CASES FILED EX PARTE – 8 CASES WITH COUNSEL

 

Updated 23 December 2009

return

Mis à jour le 23 décembre 2009

retour