BUREAU D’ARBITRAGE ET MÉDIATION DES CHEMINS DE FER DU CANADA

CANADIAN RAILWAY OFFICE OF ARBITRATION & DISPUTE RESOLUTION

MONTRÉAL, QUÉBEC
(l’Arbitre Michel G. Picher qui préside)

HORAIRE ORIGINAL DU SEPTEMBRE 2010 /
ORIGINAL SCHEDULE: SEPTEMBER 2010

 

Updated 30 September 2010

 

mis à jour le 30 septembre 2010

 

 

[3926 / 320]

MARDI LE 14 SEPTEMBRE 2010 / TUESDAY, 14 SEPTEMBER 2010

 

CROA&DR 3926

Dispute between CNR and CAW concerning claim on behalf of M. Zacchigna that the Company failed to provide a safe work environment.

 

CROA&DR 3927

Ex Parte dispute between CNR and TCRC (LE & CTY) concerning the material change notice concerning extended run service between Kamloops & McBride. [COUNSEL] [adjourned sine die]

 

CROA&DR 3928

Ex Parte dispute between CNR and TCRC concerning the discharge of Conductor following a positive drug test. [COUNSEL]

 

CROA&DR 3929

Ex Parte dispute between CNR and TCRC concerning the discipline assessed Conductor J. Roach which resulted in his discharge for accumulation of demerits. [COUNSEL]

 

CROA&DR 3930

Ex Parte dispute between CNR and TCRC concerning the discipline assessed Conductor R. Serediak which resulted in his discharge for accumulation of demerits. [COUNSEL]

 

 

 

 

WEDNESDAY, 15 SEPTEMBER 2010 / MERCREDI LE 15 SEPTEMBRE 2010

 

CROA&DR 3931

Dispute between CNR and TCRC concerning the discipline assessed Conductor which resulted in her discharge for accumulation of demerits. [withdrawn at hearing]

 

CROA&DR 3932

Dispute between CANPAR and USW, Local 1976 concerning the discharge of Q. Ly.

 

CROA&DR 3933

Dispute between CANPAR and USW, Local 1976 concerning the discharge of M. Terzo.

 

CROA&DR 3934

Dispute between CNR and USW, Local 2004 concerning claim on behalf of C. Welch.

 

CROA&DR 3935

Dispute between CNR and TCRC concerning the discipline assessed Conductor M. Beaudoin which resulted in his discharge for the accumulation of demerits.

 

CROA&DR 3936

Dispute between CNR and TCRC concerning the discipline assessed Locomotive Engineer S. Montani which resulted in his discharge for the accumulation of demerits.

 

 

 

 

THURSDAY, 16 SEPTEMBER 2010 / JEUDI LE 16 SEPTEMBRE 2010

 

PAIA 230 – 233

Trois litiges variés entre CNR et MÉTALLOS 1976 utilisant le procès PAIA.

 

CROA&DR 3937

Dispute between CPR and MWED concerning  the discipline assessed M. Pinsonneault which resulted in his discharge for accumulation.

 

IEHP 234 – 242

Various disputes between CPR and MWED utilising the IEHP process.

 

 

 

36 (20+16) CASES SCHEDULED – 25 (13+12) CASES HEARD

4 CASES FILED EX PARTE – 4 CASES WITH COUNSEL

 

Updated 30 September 2010

 

mis à jour le 30 septembre 2010