BUREAU D’ARBITRAGE ET MÉDIATION DES CHEMINS DE FER DU CANADA CANADIAN
RAILWAY OFFICE OF ARBITRATION & DISPUTE RESOLUTION MONTRÉAL, QUÉBEC HORAIRE ORIGINAL DU SEPTEMBRE 2010 /
|
||
|
Updated 30 September
2010 |
mis à jour le 30 septembre 2010 |
|
|
[3926 / 320] |
MARDI LE 14 SEPTEMBRE 2010 / TUESDAY, 14 SEPTEMBER
2010 |
|
|
Dispute between CNR and CAW concerning claim on behalf of M. Zacchigna that the Company
failed to provide a safe work environment. |
||
|
CROA&DR 3927 |
Ex Parte dispute
between CNR and TCRC (LE & CTY) concerning the
material change notice concerning extended run service between Kamloops &
McBride. [COUNSEL] [adjourned sine die] |
|
|
Ex Parte dispute
between CNR and TCRC concerning the discharge of
Conductor following a positive drug test. [COUNSEL] |
||
|
Ex Parte dispute
between CNR and TCRC concerning the discipline
assessed Conductor J. Roach which resulted in his discharge for accumulation
of demerits. [COUNSEL] |
||
|
Ex Parte dispute
between CNR and TCRC concerning the discipline
assessed Conductor R. Serediak which resulted in his discharge for
accumulation of demerits. [COUNSEL] |
||
|
|
|
|
|
|
WEDNESDAY,
15 SEPTEMBER 2010 / MERCREDI LE 15 SEPTEMBRE 2010 |
|
|
CROA&DR 3931 |
Dispute between CNR and TCRC concerning the discipline assessed Conductor which resulted
in her discharge for accumulation of demerits. [withdrawn at hearing] |
|
|
Dispute between CANPAR and USW, Local 1976 concerning the discharge of Q. Ly. |
||
|
Dispute between CANPAR and USW, Local 1976
concerning the discharge of M. Terzo. |
||
|
Dispute between CNR and USW, Local 2004 concerning claim on behalf of C. Welch. |
||
|
Dispute between CNR and TCRC concerning the discipline assessed Conductor M. Beaudoin
which resulted in his discharge for the accumulation of demerits. |
||
|
Dispute between CNR and TCRC concerning the discipline assessed Locomotive Engineer S.
Montani which resulted in his discharge for the accumulation of demerits. |
||
|
|
|
|
|
|
THURSDAY,
16 SEPTEMBER 2010 / JEUDI LE 16 SEPTEMBRE 2010 |
|
|
PAIA 230 – 233 |
Trois
litiges variés entre CNR et MÉTALLOS 1976 utilisant le procès PAIA. |
|
|
Dispute between CPR and MWED concerning the
discipline assessed M. Pinsonneault which resulted in his discharge for
accumulation. |
||
|
IEHP 234 – 242 |
Various disputes
between CPR and MWED utilising the IEHP process. |
|
|
|
|
|
|
36
(20+16) CASES SCHEDULED – 25 (13+12) CASES HEARD 4
CASES FILED EX PARTE – 4 CASES WITH COUNSEL |
||
|
Updated 30 September
2010 |
mis à jour le 30 septembre 2010 |
|
|
|
|
|